Agenda item

19/02596/FULLS

(OFFICER RECOMMENDATION: PERMISSION)

SITE: East View, Saunders Lane, Awbridge SO51 0GP

AWBRIDGE

CASE OFFICER: Mr Paul Goodman

 

Minutes:

 

 

APPLICATION NO.

19/02596/FULLS

 

 

APPLICATION TYPE

FULL APPLICATION - SOUTH

 

 

REGISTERED

11.11.2019

 

 

APPLICANT

Mr Samuel Doswell

 

 

SITE

East View , Saunders Lane, Awbridge, SO51 0GP,  AWBRIDGE

 

 

PROPOSAL

Erection of 5 dwellings

 

 

AMENDMENTS

Amended plans received 06/02/20, 06/05/20, 18/06/20, 01/07/20, 08/02/21 & 04/03/21.

 

 

CASE OFFICER

Mr Paul Goodman

 

 

 

 

Delegated to the Head of Planning & Building for:

(i)  Completion of satisfactory consultation with the Ecology Officer, including the addition or amendment of relevant ecology conditions (where necessary and appropriate), and

(ii)  Completion of a suitable legal agreement to secure;

·  Financial contribution in the amount of £5,200 (£1300 x 4) towards the New Forest SPA

·  Secure use of the Bio-Bubble Waste Water Treatment Plant and Maintenance in accordance with Paul Basham Associates Foul Water Management Plan Ref 187.5001/FWMP/1.

Then PERMISSION subject to:

 

1.

The development hereby permitted shall be begun within three years from the date of this permission.

Reason:  To comply with the provision of Section 91 of the Town and Country Planning Act 1990 as amended by Section 51 of the Planning and Compulsory Purchase Act 2004.

 

2.

No development shall take place above DPC level of the development hereby permitted until samples and details of the materials to be used in the construction of all external surfaces hereby permitted have been submitted to and approved in writing by the Local Planning Authority. Development shall be carried out in accordance with the approved details.

Reason:  To ensure the development has a satisfactory external appearance in the interest of visual amenities in accordance with Test Valley Borough Revised Local Plan (2016) Policy E1.

 

3.

The development hereby approved shall be undertaken in full accordance with the provisions set out within the Arbor Eco Consultancy Ref MB191009-01 (June 2020) and its accompanying Tree Protection Plan.

Reason:  To ensure the enhancement of the development by the retention of existing trees and natural features during the construction phase in accordance with Test Valley Borough Revised Local Plan policy E2.

 

4.

Tree protective measures installed (in accordance with the tree protection condition) shall be maintained and retained for the full duration of works or until such time as agreed in writing with the Local Planning Authority. No activities, nor material storage, nor placement of site huts or other equipment what-so-ever shall take place within the barrier.

Reason:  To ensure the avoidance of damage to existing trees and natural features during the construction phase in accordance with Test Valley Borough Revised Local Plan policy E2.

 

5.

All service routes, drain runs, soakaways or excavations in connection with the development hereby permitted shall remain wholly outside the tree protective barrier.

Reason:  To ensure the avoidance of damage to existing trees and natural features during the construction phase in accordance with Test Valley Borough Revised Local Plan policy E2.

 

6.

No development shall take place above DPC level until full details of hard and soft landscape works have been submitted and approved. Details shall include-where appropriate: proposed finished levels or contours; means of enclosure; car parking layouts; other vehicle and pedestrian access and circulation areas; hard surfacing materials; minor artefacts and structures (e.g. furniture, play equipment, refuse or other storage units, signs, lighting, etc.); proposed and existing functional services above and below ground (e.g. drainage, power, communications cables, pipelines etc. indicating lines, manholes, supports.); retained historic landscape features and proposals for restoration, where relevant.

Soft landscape works shall include: planting plans; written specifications (including cultivation and other operations associated with plant and grass establishment); schedules of plants, noting species, plant sizes and proposed numbers/densities. The soft landscape proposals shall include details of soft boundary treatments to the outside edges of the site.

The landscape works shall be carried out in accordance with the implementation programme and in accordance with the management plan.

Reason:  To improve the appearance of the site and enhance the character of the development in the interest of visual amenity and contribute to the character of the local area in accordance with Test Valley Borough Revised Local Plan (2016) Policy E1 and E2.

 

7.

The development shall not be occupied until space has been laid out and provided for the parking and manoeuvring of vehicles to enable them to enter and leave the site in a forward gear in accordance with the approved plan and this space shall thereafter be reserved for such purposes at all times.

Reason:  In the interests of highway safety in accordance with Test Valley Borough Revised Local Plan (2016) Policy T1.

 

8.

Any gates shall be set back at least 4.5 metres from the edge of the carriageway of the adjoining highway.

Reason:  In the interest of highway safety in accordance with Test Valley Borough Revised Local Plan (2016) Policy T1.

 

9.

Prior to the commencement of development full details of the layout for the parking and manoeuvring onsite of contractor's and delivery vehicles during the construction period shall be submitted to and approved in writing by the Local Planning Authority. The approved scheme shall be implemented prior to the commencement of development and retained for the duration of the construction period.

Reason:  In the interest of highway safety in accordance with Test Valley Borough Local Plan 2016 policy T1.

 

 

10.

There shall be no construction or demolition works, no machinery shall be operated, no processes carried out and no deliveries received or dispatched outside the following times: 07:30 to 18:00 hours Monday to Friday and 08:00 to 13:00 hours on Saturday.  In addition, no such activities shall take place on Sundays, Bank or Public holidays.

Reason: In the interests of the amenities of neighbouring properties in accordance with Test Valley Borough Local Plan policies E8 and LWH4.

11.

No development shall take place (other than any approved demolition and site clearance works) until an assessment of the nature and extent of any contamination and a scheme for remediating the contamination has been submitted to and approved in writing by the Local Planning Authority. The assessment must be undertaken by a competent person, and shall assess the presence of any contamination on the site, whether or not it originates on the site. The assessment shall comprise at least a desk study and qualitative risk assessment and, where appropriate, the assessment shall be extended following further site investigation work. In the event that contamination is found, or is considered likely, the scheme shall contain remediation proposals designed to bring the site to a condition suitable for the intended use. Such remediation proposals shall include clear remediation objectives and criteria, an appraisal of the remediation options, and the arrangements for the supervision of remediation works by a competent person. The site shall not be brought in to use until a verification report, for the purpose of certifying adherence to the approved remediation scheme, has been submitted to and approved in writing by the Local Planning Authority.

Reason:  To ensure a safe living/working environment in accordance with Test Valley Borough Revised Local Plan 2016 policy E8.

12.

The development hereby approved shall be designed and built to meet Regulation 36 2 (b) requirement of 110 litres/person/day water efficiency set out in part G2 of Building Regulations 2015.

Reason: In the interests of improving water usage efficiency in accordance with policy E7 of the Test Valley Borough Revised Local Plan 2016.

13.

The drainage system shall be constructed in accordance with the Paul Basham Associates Foul Water Management Plan Ref 187.5001/FWMP/1. Any changes to the approved documentation must be submitted to and approved in writing by Local Planning Authority and Lead Local Flood Authority. Any revised details submitted for approval must include a technical summary highlighting any changes, updated detailed drainage drawings and detailed drainage calculations.

Details for the long-term maintenance arrangements for the surface water drainage system shall be submitted to and approved in writing by the Local Planning Authority prior to the first occupation of any of the dwellings. The submitted details shall include;

a. Maintenance schedules for each drainage feature type and ownership.

b. Details of protection measures.

Maintenance and protection measures shall be carried out in accordance with the approved details.

Reason: To ensure a satisfactory form of development and in the interest of local amenities in accordance with Test Valley Borough Revised Local Plan 2016 policy E7.

14.

Development shall proceed in accordance with the ecological mitigation, compensation and enhancement measures detailed within the Preliminary Ecology Appraisal Report Number: 0314, Issue Number: 06 (4th March 2021) unless otherwise agreed in writing by the Local Planning Authority. Ecological mitigation, compensation and enhancement features shall be created/installed as per ecologists instructions and retained in perpetuity in a condition suited for their intended purpose.

Reason: to protect biodiversity in accordance with the Conservation Regulations 2017, Wildlife & Countryside Act 1981, the NERC Act (2006), NPPF and with Policy E5 of the Test Valley Borough Council Adopted Local Plan 2011-2029.

15.

No development shall take place unless or until an Environmental Management Plan has been submitted to, and approved in writing by, the Local Planning Authority.  The Environmental Management Plan shall cover the control of noise, dust and spoil during the demolition, site preparation and construction phases of development. The Environmental Management Plan shall include the provision of wheel washing, and any other suitable facility, to avoid the deposit of spoil onto the highway network. Work shall be undertaken in accordance with the approved Environmental Management Plan.

Reason: In the interests of the amenities of neighbouring properties in accordance with Test Valley Borough Local Plan policies E8 and LWH4.

16.

Details of any external lighting shall be submitted to and approved in writing by the local planning authority prior to first installing any such lighting before the building(s) is/are occupied.  Development shall be carried out in accordance with the approved details.

Reason:  To safeguard the amenities of the area and/or in the interests of road safety in accordance with Test Valley Borough Revised Local Plan (2016) Policy E8.

17.

The first floor windows in the rear elevations of Plots 2 and 5 of the development hereby permitted shall be fitted with obscured glazing and non-opening below a height of 1.7m above the internal finished floor level. The windows shall thereafter be retained as such, unless otherwise agreed in writing by the Local Planning Authority.

Reason:  To protect the amenity and privacy of the adjoining occupiers in accordance with Test Valley Borough Revised Local Plan (2016) Policy LWH4

18.

Notwithstanding the provisions of the Town and Country Planning (General Permitted Development) Order 2015 (or any order revoking and re-enacting that Order with or without modification), no windows/dormer windows above ground floor level of the proposal hereby permitted [other than those expressly authorised by this permission] shall be constructed.

Reason:  In order that the Local Planning Authority can exercise control in the locality in the interest of the local amenities in accordance with Test Valley Borough Revised Local Plan (2016) Policy.

 

19.

The development hereby permitted shall not be carried out except in

complete accordance with the details shown on the submitted

plans, numbers:

7628_D01 E

7628_D04 D

7628_D06 C

7628_D08 C

7628_D11 A

7628_D15 A

7628_D03 B

7628_D05 C

7628_D07 B

7628_D09

7628_D10

7628_D13

7628_D14

187.5001-501

Reason:  For the avoidance of doubt and in the interests of proper planning.

20.

The drainage system shall be constructed in accordance with the Paul Basham Associates Drainage Strategy Plan Ref 187.5001-500. Surface water discharge to the watercourse shall be limited to 2.0 l/s. Any changes to the approved documentation must be submitted to and approved in writing by Local Planning Authority. Any revised details submitted for approval must include a technical summary highlighting any changes, updated detailed drainage drawings and detailed drainage calculations. Details for the long-term maintenance arrangements for the surface water drainage system shall be submitted to and approved in writing by the Local Planning Authority prior to the first occupation of any of the dwellings. The submitted details shall include;

a.  Maintenance schedules for each drainage feature type and ownership.

b.  Details of protection measures.

Maintenance and protection measures shall be carried out in accordance with the approved details.

Reason:  To ensure a satisfactory form of development and in the interest of local amenities in accordance with Test Valley Borough Revised Local Plan 2016 policy E7.

21.

Before the development hereby permitted is commenced details, including plans and cross sections, shall be submitted to and approved by the Local Planning Authority of the existing and proposed ground levels of the development and the boundaries of the site and the height of the ground floor slab and damp proof course in relation thereto. Development shall be undertaken in accordance with the approved details.

Reason:  To ensure satisfactory relationship between the new development and the adjacent residential dwellings, and amenity areas in accordance with Test Valley Borough Revised Local Plan (2016) Policy E1 and LHW4.

 

Notes to Applicant:

1.

The development hereby permitted shall be carried out and completed strictly in accordance with the submitted plans, specifications and written particulars for which permission is hereby granted or which are subsequently submitted to, and approved in writing by, the Local Planning Authority and in compliance with any conditions imposed by the Local Planning Authority.

2.

In reaching this decision Test Valley Borough Council (TVBC) has had regard to the National Planning Policy Framework and takes a positive and proactive approach to development proposals focused on solutions. TVBC work with applicants and their agents in a positive and proactive manner offering a pre-application advice service and updating applicants/agents of issues that may arise in dealing with the application and where possible suggesting solutions.

3.

Bats and their roosts receive strict legal protection under the Wildlife and Countryside Act 1981 (as amended) and the Conservation of Habitats and Species Regulations 2010 (as amended). All work must stop immediately if bats, or evidence of bat presence (e.g. droppings, bat carcasses or insect remains), are encountered at any point during this development. Should this occur, further advice should be sought from Natural England and/or a professional ecologist.

4.

Birds' nests, when occupied or being built, receive legal protection under the Wildlife and Countryside Act 1981 (as amended). It is highly advisable to undertake clearance of potential bird nesting habitat (such as hedges, scrub, trees, suitable outbuildings etc.) outside the bird nesting season, which is generally seen as extending from March to the end of August, although may extend longer depending on local conditions. If there is absolutely no alternative to doing the work in during this period then a thorough, careful and quiet examination of the affected area must be carried out before clearance starts. If occupied nests are present then work must stop in that area, a suitable (approximately 5m) stand-off maintained, and clearance can only recommence once the nest becomes unoccupied of its own accord.

 

Supporting documents: